SkyHunter406 4000-10 AP User Manual

Page 5

Advertising
background image

5

3.2

MOUNTING LOCATION - ROTARY-WING AIRCRAFT (HELICOPTER)

a.

The POINTER SENTRY ELT must be located on the primary structure. This location must be accessible for
manual activation/deactivation, testing, and servicing when the helicopter is on the ground. See Section 3.4 for
installation details.

All hardware shown is included in the standard Pointer Sentry 4000-10 Installation Kit.

Advertising
This manual is related to the following products: