Sure Heat AGA Vented Dual AGA User Manual

Page 7

Advertising
background image

4. Be certain all connections are tight and use compound on all male threads to seal joints.

The pipe compound must be resistant to the action of L.P. gas. Test all connections with a soapy water
solution with gas supply turned on. If bubbles appear on any connection, retighten and reset. Once it is
determined there are no leaks whatsoever, turn off gas supply and move to next assembly step.

Granule, Ember, and Log Grate Placement

1A.

Natural Gas Installation: Spread granules or sand over each installed burner pan. Granules should be

sloped to the same angle as the burner pan filling the entire pan (See Figure 13.)

1B.

L.P. Gas Installation: Spread vermiculite (white) over each installed burner pan. Vermiculite should be

sloped to the same angle as the burner pan filling the entire pan (See Figure 13.)

2. Spread glowing embers over the top of the granules or

vermiculite covering the entire surface area,

concentrating on the front and sides of each burner pan for the most realistic burning effect.

3. Place log grate over the burner pan. (See Figure 14.)

4. Place the (2) back log supports on the back of the grate. (See Figure 14.)

Log Placement

1. Place the longest log in the front section of each grate as far foward as possible.

2. Place the next longest log on the back log support brackets as far back as possible, or on RW1000 log

sets on the grate as far back as possible.

3. Arrange top logs according to the illustration for your specific set size.

Page 7

It may be necessary to squeeze the
back log support with pliers after
attaching the grate.

Advertising