Installation for infrared burner systems, Valve body assembly – Sure Heat CVS303 Natural Gas Conversion Kit User Manual

Page 5

Advertising
background image

INSTALLATION fOr

INfrArED bUrNEr SYSTEMS

Valve Body Assembly

1. Slide the hole in the heat shield over the 3/8” NPT threads on the

Gas Control valve (Part # 3). (See Figure 17)

2. Then secure the heat shield in place with the lock nut (Part # 16).

(See Figure 18)

3.. Attach the 3/8” Flare to 3/8” NPT Connector (Part # 21) to the

Gas Control Valve. (See Figure 19)

NOTE: This connector fitting has two (2) different thread patterns

and will only install one way.

4. Attach the other end of the connector to the inlet fitting on the infrared

burner system. (See Figure 20)

5. Attach the pilot bracket (Part # 8) to the burner pan using the sheet

metal screw (Part # 9). (See Figure 21)

NOTE: The Pilot Bracket utilizes four mounting holes for adjustment

of the Pilot Burner Assembly should your installation require repositioning.

Repositioning of the Pilot Burner Assembly may be necessary if the log

set is experiencing intermittent shutdown. Shutdown is caused by

overheating of the Pilot Burner Assembly by the main burner flame.

If shut down is occurring, move the Pilot Burner Assembly over to the

next mounting hole so that only the tips of the Pilot Burner Assembly

are hanging over the Burner Pan.

6. Carefully bend the Thermocouple lead (Part #5) and attach to the

back of the control valve. (See Figure 22)

NOTE: When screwing into the Control Valve, hand tighten both the

Pilot Gas supply line and Thermocouple Lead, then tighten 1/8 turn

with a wrench. DO NOT OVER TIGHTEN as this will cause the Pilot

to not function properly.

Figure 17

Figure 18

Figure 19

Figure 20

Figure 21

Figure 22

Advertising