Fieldpilot, Mp p p, G, i & b – TeeJet FieldPilot Install John Deere 8x20 User Manual

Page 10: Prepare the fieldpilot valve, Install the fieldpilot valve bracket

Advertising
background image

8

www.teejet.com

FieldPilot

®

1. PrePare the FieldPilot ValVe

Install fitting

(M)

in the A & B ports. Install fitting

(P)

in the P, T and LS ports.

Figure 1-4: Prepare the FieldPilot Valve

M

M

p

p

p

2. install the FieldPilot ValVe Bracket

The valve bracket

(J)

will mount to the rear of the tractor, on the right side just above the implement lights

connector. Mount the bracket

(J)

as shown using (2) 3/8” bolts

(G)

, (2) 3/8 nuts

(I)

and (2) 3/8” washers

(B)

.

Figure 1-5: Install Mounting Bracket for FieldPilot Valve

J

G, I & B

Advertising