Fieldpilot, Mp p p, G, i & b – TeeJet FieldPilot Install John Deere 8x20 User Manual
Page 10: Prepare the fieldpilot valve, Install the fieldpilot valve bracket
Advertising
8
www.teejet.com
FieldPilot
®
1. PrePare the FieldPilot ValVe
Install fitting
(M)
in the A & B ports. Install fitting
(P)
in the P, T and LS ports.
Figure 1-4: Prepare the FieldPilot Valve
M
M
p
p
p
2. install the FieldPilot ValVe Bracket
The valve bracket
(J)
will mount to the rear of the tractor, on the right side just above the implement lights
connector. Mount the bracket
(J)
as shown using (2) 3/8” bolts
(G)
, (2) 3/8 nuts
(I)
and (2) 3/8” washers
(B)
.
Figure 1-5: Install Mounting Bracket for FieldPilot Valve
J
G, I & B
Advertising