Crown Boiler KSZ175 User Manual

Page 15

Advertising
background image

13

Boiler or system Flooding

Hammering

Failure to heat one or more radiators

Avoid the common piping mistakes shown in Figure 11. This applies even if the existing boiler has one of the piping mistakes

shown in Figure 11 and appears to be working. If two or more steam mains must be connected to the boiler, connect a

separate take-off for each main into the header between the riser(s) and equalizer. Also note the following points:
1) A size reduction must be made to connect the header to the equalizer. This reduction must be made in the vertical equalizer

line. Do not make this size reduction in the horizontal header.
2) One-pipe steam systems require air vents on each radiator, as well as at the end of each main. For the system to work

properly, these vents must be properly installed, sized, and be in good condition. Inspect and replace any defective vents. If

there are no vents at the ends of the mains, install them.
3) Do not attempt to manifold multiple KSZ boilers with gravity returns.
4) For installations with condensate or boiler feed pumps, follow the pump manufacturer’s piping instructions. Such systems

generally do not require Hartford loops.
5) Do not use a check valve in place of, or in addition to, a Hartford loop on a gravity return system.
6) Pipe the fill connection from a clean source of cold water. When the water supply is from a well, make sure that a strainer

is installed in the well system.

Piping Installation

1) Remove parts bag from boiler crate.
2) Install safety valve (spindle must be in vertical position) into the 3/4” tapping on top of the boiler.
3) Pipe the discharge of the safety relief valve to a location where water or steam will not create a hazard or cause property

damage if the valve opens. The end of the discharge pipe must terminate in an unthreaded pipe. If the safety valve discharge

is not piped to a drain, it must terminate at least 6 inches above the floor. The termination of the safety valve discharge piping

must be in an area where it is not likely to become plugged by debris or subjected to freezing.
4) Install drain valve provided into the return piping.
5) Connect system supply and return to boiler. See Figure 10. All KSZ boilers use one supply riser and one return tapping.

FIGurE 11: cOMMOn nEar-BOIlEr PIPInG MIStaKES

Advertising