Fig. 2 — 17cb centrifugal compressor, Initial preparation – Carrier 17CB User Manual

Page 4

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

I

1, OS fieservoif S5g,fit:G:!ass-

2- Oii^C^iargjng EJ

dow

,

Sc&i 01} Return

Sea! Cii Return Pomi>

Oil Reservoir Thermosneter

5, Oii Beater Terrninaf Sox

6. Ot! Pump !\tamep!ate

a

4.

7. 0:i Pomp Terminai Box
a Oii Ciwrging Vatve

■9. Oil Beater Thermostat

10. Oil Pressure Gege

tt. Main Searing Oi!

Thermometer

12

. Git Pilte;

15. Oii Pressure Oifferenirai

Switch

14. Oi! Cooler

: IS. Gii C>x>}er Solertoid Valve

16. Oil Cooler Plug Cock

T7. Porm "G" Solenoid Valve

15. Vai'te Speed Valve

IS. form "W' SoiShoid Valve
20. pii PressureReguiating Valve
21. Compressor Controi Wiring

dunctiott 8ox

22. i nspection Cover

23. Economizer Stubout

24. Oischarge Stt:i50ut

Fig. 2 — 17CB Centrifugal Compressor

INITIAL PREPARATION

C.AUTION: Do not start compressor or oil

purap, even for a rotation check, tmiess com­
pressor is charged with oil and machine charged

with refri^rant.

Do not apply Yoitage of any kind while

machine is under dehydration vacuum.

Machine Tightness

— If machine leak testing and

dehydration was not completed at installation,
check machine tightness (including pumpout sys­
tem) as described below. Dehydration must be

repeated if machine has been idle for several weeks
or more after initial dehydration.

Check for Large Leaks

— Using one of the methods

described below, pressurize the machine to the
level listed in Table 1. Do not exceed test pressure.
Listen for large leaks as the pressure builds up. If
test pressure holds for one hour, proceed with
Check for Small Leaks.

All 17CB machines may be pressurized with

cylinders of dry air or nitrogen thru the cooler
charging valve. Dry air or nitrogen charging is
preferable to purge or pumpout charging as it
ensures that moisture will not be introduced into the
machine. To pressurize with nitrogen (or dry air):

1. Connect a copper tube from charging valve to

pressure cylinder. Never apply full cylinder
pressure to the pressurizing hne. Follow steps 2
thru 5 in proper sequence.

2

.

3.
4.

Open cooler charging valve fully.
Open cylinder regulating valve slowly.
Observe cooler or condenser pressure gage and

close cylinder regulating valve when pressure
reaches test pressure listed in Table 1.

Do not exceed test pressure.!

5. Close cooler charging valve. Remove copper

tube.

Table 1 — Test Pressures

MACHINE SIZE

REFRIG

TEST

PRESSURE

17CB1300 thru 1600

R-11

8 to 10 psig

17CB1800 thru 2000

R-114

30 to 35 psig

Refrigerant 11 machines may be pressurized

with the purge pump. Ensure that electrical supply
to purge pump is 120 volts. Then follow operation

3 on the purge valve chart (item 24, Fig. 1).

Refrigerant 114 machines may be pressurized

with the pumpout unit. This method is detailed in
the section entitled Pumpout Procedures.

Check for Small Leaks

1. Pull a vacuum equal to 5 in. Hg (12.5 psia) by

using purge pump operation 2 (Refrigerant 11
machines), pumpout unit (Refrigerant 114
machines) or by applying a vacuum pump at
the cooler charging valve.

Advertising