Compaq 3000 User Manual

Page 67

Advertising
background image

RAID Array 3000 Controller Shelf

3–16

EK–SMCPQ–UG. C01

12.

After the UPS has been set to the correct input voltage level, set the UPS
low-battery warning option to five minutes (refer to UPS manual for instruc-
tions).

13.

This completes the Controller and Device Expansion Shelf cabling proce-
dure. Dress and ty-wrap related cable groups, and then refer to the RAID Ar-
ray 3000 Getting Started and Command Console Installation and User
Guides
for information describing how to setup and configure your subsys-
tem.

Figure 3–9 Controller/ Single Device Expansion Shelf Cabling Diagram

SHR-1117

DEVICE EXPANSION SHELF # 1

CONTROLLER SHELF

P/S

A

P/S

B

P/S

B

P/S

A

CTR 0

Host 0 I/O

Module

Device

I/O Module

Personality I/O

Module

SCSI Cable

BN37A-0E

To

Maintenance

PC

To Host System

SCSI Cable

BN37A-05

Serial Control

Cable

(17-04730-01)

ON

OFF

1 2 3 4 5 6 7

SCSI Bus Address

Switch (S3)

OFF ON

1
2
3
4

SCSI Bus

Termination
Switch (S4)

OFF ON

1
2
3
4

SCSI Bus

Termination
Switch (S4)

Advertising