Assembly checkpoints – Nespresso Citiz & Co  EF 488 User Manual

Page 117

Advertising
background image

Citiz service manual 

117 

R E P A I R S 

• 

Remove first 
­ NTC connector from electronic control board, 
­ connector cable from flow meter, 
­ electronic lid (43), 
­ faston receptacles from electronic control board. 

• 

Insert tip of screwdriver between chassis (1) and protective case of electronic control 
board (42) to release latches. Then pull out assembly. 

Assembly checkpoints 

• 

The left and right button prints (42) are marked with "L" or "R" for easy identification. 

• 

After assembly check the plug arrangement of the mainboard (see “Wiring 
diagrams” on page 118 and following). 

• 

Lay connection wires to button prints in brackets and cable guides like shown. 

For installing and 
connecting a new 
electronic control 

board, the service techni­ 
cian must be earthed with 
a grounding band.

Advertising