Assembly checkpoints – Nespresso Citiz & Co  EF 488 User Manual

Page 79

Advertising
background image

Citiz service manual 

79 

R E P A I R S 

• 

If present, disconnect ground wire (15, part of thermoblock assembly). 

• 

If the thermoblock or core unit has to be replaced, disconnect milk frother connector 
(57). Otherwise the core unit can be removed together with this connector (see page 
73). 

• 

Remove water tank connector (53, see page 71). 

Assembly checkpoints 

• 

All covers are assembled on the core unit. 

• 

Check that wiring between core unit and platform is led through cable fixation (71). 

• 

Use marked cable guides to lay wires. 

• 

Check wiring of milk frother connector (57), see detail. 

• 

Check wiring of mains switch (54), see "Wiring diagrams ­ model Citiz & milk, 
EF 485/486" on page 124 and following. 

• 

During assembly of the water tank connector (53) on the platform, each of its 3 
latches has to engage with an audible click. 

The flat receptacle on 
the ground wire has a 
special connector 

latching (see detail). Press 
down lever at first, then pull 
off receptacle.

Advertising