Dlp-e106 clean fiber connectors – Cisco 15600 User Manual

Page 6

Advertising
background image

17-6

Cisco ONS 15600 Procedure Guide, R8.0

Chapter 17 DLPs E100 to E199

DLP- E106 Clean Fiber Connectors

Step 5

In the Destination area, complete the following:

Node—Choose the destination node.

Slot—Choose the destination slot.

Port—Choose the destination port.

Channel—Shown if you chose DCC Tunnel-D1-D3 as the tunnel type. Choose one of the following:

DCC1 (D1-D3)—Section DCC

DCC2 (D4-D6)—Line DCC 1

DCC3 (D7-D9)—Line DCC 2

DCC4 (D10-D12)—Line DCC 3

DCC options do not appear if they are used by the ONS 15600 (DCC1) or other tunnels.

Step 6

Click Finish.

Step 7

Put the ports that are hosting the DCC tunnel in service. See the

“DLP-E115 Change the Service State

for a Port” task on page 17-16

for instructions.

Step 8

Return to your originating procedure (NTP).

DLP-E106 Clean Fiber Connectors

Note

Replace all dust caps whenever the equipment will be unused for 30 minutes or more.

Step 1

Remove the dust cap from the fiber connector.

Step 2

To use the desktop hand tool:

a.

Advance the 3M high-performance fiber-optic wipe in the desktop hand tool to access the unused
wipe area.

Note

To replace the fiber-optic wipe in the desktop hand tool, remove the frame cover. Put a new
wipe over the base of the desktop hand tool with the stitching of the wipe aligned lengthwise
with the tool. Place the frame cover on the tool and press firmly to reattach.

Purpose

This task cleans the fiber connectors.

Tools/Equipment

Inspection microscope (suggested: Westover FBP-CIS-1)

Desktop hand tool

Scrub tool

3M high-performance fiber-optic wipes

Compressed air/duster

Prerequisite Procedures

None

Required/As Needed

Required

Onsite/Remote

Onsite

Security Level

None

Advertising