Step 4, Door track assembly – Arrow Storage Products 697.68222 User Manual

Page 17

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Step 4

• Parts Needed For •

• 6403 Door Track Splice (1)

Door Track Assembly

• 9366 Door Track (2)

A17

The door track assembly supports
the sliding doors and reinforces the
front wall. It is made up of three pieces.

1

Using the door track splice,

(painted),

join

the

door

track

(galvanized) pieces end-to-end as
shown.

2

Insert four screws

from the under­

side only.

Hint: The holes in the top side of the

doortrackassemblyareforfastening
the gable to the top of the front wall in
a later step.

NOTE:

Door Track Splice (painted part)

66769

3

Position

door slides

onto the

legs, from the end of door track

assembly, as shown in the end view.

4

Set this piece aside for later use.

1181/8"

300,0cm

Long Leg
on Top

Short Leg
on Bottom

STEP

STEP

3

4

1181/8"

300,0cm

ENDVIEW

1181/8"

300,0cm

17

Advertising