Step 17

• Parts Needed For •

Ridge Caps & Panels

'6538 Roof Panel (2)
' 6869 Ridge Cap (3)
' 10510 Right Roof Panel (1)

' 10511 Left Roof Panel (1)

1

Install the third

ridge caps 6869

overlapping the second ridge caps
while installing the remaining

roof

panels 6538. Hint: The bolts on the
ridge cap need to be left loose to
move the ridge cap to the side and
overlap the ribs ofthe next roof panel.
Cover the notched areas of the roof
panels with strips of weather strip­
ping tape and continue weatherstrip­
ping the ridge.

2

Install the

left 10511 and right

roof panel 10510 as you unroll the

weather stripping tape, and press it
down. Fasten the lower end of the

panels to the side wall angles using
screws and washers.

3

Fasten the roof panel ribs,

peak

caps and ridge caps together using
bolts and nuts.

Reducing Large Gable Bulge

Loosen eight bolts and nuts shown. Apply
pressure with one hand at the peak of the
gable and tighten bolt #1. Keeping pressure

on the gable work down the slope tightening
each bolt. Excess material will overlap small­
er gable at seam. Once material bulge is
worked out tighten four vertical bolts that
connect the large and small gables.