Parts needed for, Door installation & adjustment, Step 20 – Arrow Storage Products 697.68222 User Manual

Page 33

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Step 20

• Parts Needed For •

Door Installation & Adjustment

I Right Door Assembly (1)
I Left Door Assembly (1)

SQ33

1 From inside the building, put the

bottom of the right door assembly (on

your left when you are inside the

building) behind door jamb into the

front frame track.

2

Position the top of the door so that

the holes in the door line up with the

holes in the door slides.

STEP

3

Fasten the door to the door slides

using two #106x1/2" (13mm) screws
per door slide.

NOTE

The holes in the door slides allow

you to adjust the doors. Place the

door in the middle holes.

4

Repeat steps 1 through 3 for the

left door.

#10Bx1/2"(13mm)

Screw#

Adjustment Holes Allow

Doors to Meet Evenly

Along Their Length

Keep this Owner's Manual and Assembly Instructions for future reference

33

Advertising