Installation instructions – Admiral AW-05CR1FHLU User Manual

Page 11

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Installation Instructions /

5. Install the L brackets on the outer sill with the

short side of the bracket against the back of the

inner sill. Install one L bracket 7.5” to each side

of center line. See Fig. 5.

6. Carefully lift the air conditioner and slide it into

the open window. Make sure the bottom guide

of the unit drops Into the notches of the L brackets.

When the air conditioner drops into the L brackets,

the air conditioner will be centered in window opening
as shown in Fig. 6.

While steadying the air conditioner, carefully bring

the window sash down behind the top channel

of the unit, as shown in Fig. 7.

Fix top channel to window sash with one 3/4”

screw, and fix side curtain frames with four 3/4"

screws as shown in Fig .6.

7. If storm window presents interference, fasten

a 2" wide wood sti’ip to the inner window sill across

the full width of the sill. The wood strip should

be thick enough to raise the height of the window

sill.so that the unit can be installed without interference
from the storm window frame, as show in Fig. 8.

Top of wood strip should be approximately 3/4"

higher than the storm window frame to help

condensation to drain properly to the outside.

Install a second wood strip (approximately 17"

long by

1

i/

2

”wide and same thickness as first

sti’ip) in the center of the outer sill flush against
the back of the inner sill.

Screw the L brackets into this strip, this will raise

the L bracket as shown in Fig. 8.

Fig. 6

.Seal

Abput 5'

L Bracket

Fig.7

Advertising
This manual is related to the following products: