Commissioning Check List

General

†

All equipment ordered by the customer is installed.

†

The unit is level and secure.

†

The mains and control wiring are complete and the circuit breaker and GPO are turned ON.

†

All Controller functions for the appliance operate.

†

All electrical or water connections are to manufacturers specifications and the relevant electrical or

plumbing standards and codes.

Unit - Ducted Evaporative Air Conditioner

†

The water supply line has been flushed to clear swarf and debris and is free of leaks.

†

The tank is free of foreign matter and debris and the water isolating tap is turned ON.

†

Water drainpipe work is completed and sealed.

†

The water basin fills with water and the float valve closes correctly when the water level is 65-

70mm below the overflow level.

†

The water pump operates correctly when turned ON at the controller.

†

The Dialflo water bleed rate is adjusted to suit local water conditions.

†

The Superclean Dump Valve (option). The tank drains correctly when unit turns off.

†

The fan deck is correctly located and the fan blade spins freely.

†

The fan operates through the entire speed range.

†

The minimum fan speed is correctly set.

†

Water distribution is even with the filter pads fitted and the air conditioner operating pump and fan.

†

Areas of high water pressure (Exceeding 500Kpa) a water pressure limiting valve must be fitted in

accordance with AS3500. Consequential damage from high water pressure is not covered by

warranty.