Ductwork, Site, Customer hand over – Bonaire Deluxe Control (LV) - PNE User Manual

Page 13: Site customer hand over

Advertising
background image

Manual Comfort Control

Control Installation & Setup

PNE2002 Series Control

Page 13

Ductwork

†

All ductwork is completed to plan, correctly supported and airtight, with no bend less than 1.5 x the
ductwork diameter.

†

Air distribution checked, dampers are adjusted and all outlets correctly adjusted and wiped clean.

†

All roof penetrations are fully sealed and watertight.

†

Man hole cover replaced.

Site

†

All rubbish has been removed from inside and on the roof.

Customer Hand Over

†

The operation of the Controller.

†

The need to open windows and doors for the correct operation of Fresh Air Conditioning

†

The operation of the bleed or dumping system and it’s importance to operate all the time in ducted

fresh air conditioning

†

Maintenance requirements