Pipeloading status indicators – Ditch Witch JT1220 User Manual
Page 37
Advertising
Controls - 36
JT1220 Mach 1 Operator’s Manual
Instrument Cluster
CMW
Pipeloading Status Indicators
1.
Control cycle light (green)
2.
Front wrench status indicator
3.
Shuttle home status indicator
4.
Carriage status indicator
5.
Rear stop status indicator
6.
Pipe lift status indicator
7.
Front pipe box status indicator
8.
Rear pipe box status indicator
Item
Description
Notes
1.
Control cycle light
(green)
If nothing is being controlled,
light should be off.
If system is waiting for an
action before starting cycle,
light should flash on and off.
If something is being
controlled, light should be on.
If control cycle is interrupted,
light should flash twice
quickly.
Advertising