Mr90 operator’s manual – Ditch Witch MR90 User Manual

Page 64

Advertising
background image

MR90 Operator’s Manual

Systems and Equipment - 63

Recommended Products

CMW

®

sand, gravel, clay or
shale

35 - 40 lb (16-18 kg) Bore-Gel
.5lb (227 g) EZ-Mud Gold

Vary mixture according to percentage of
sand and clay

clay

.5 lb (225 g) Poly Bore

Flow rate should be 3-5 parts fluid to 1
part soil.

swelling/sticky clay

.75 - 1 lb (340-450 g) EZ-Mud
Gold

Flow rate should be 3-5 parts fluid to 1
part soil.

solid rock (shale)

40 lb (18 kg) Bore-Gel

Use .5 pt (235 mL) of No Sag for large
diameter or longer bores

solid rock (other than
shale)

40 - 50 lb (18-23 kg) Bore-Gel

Use .5 pt (235 mL) of EZ-Mud in reactive
shales

rock/clay mixture

40 - 50 lb (18-23 kg) Bore-Gel
.5 lb (227 g) EZ-Mud Gold

rock/sand mixture

40 - 50 lb (18-23 kg) Bore-Gel

Use .5 pt (235 mL) of No Sag for large
diameter or longer bores

fractured rock

50 lb (23 kg) Bore-Gel
.5 - 1lb (225-450 g) No-Sag

Use .5 lb (225 g) of Barolift to reduce fluid
loss to formation

Soil type

Mixture/100 gal (378 L) of water

Notes

Advertising