Planning, Setting up at jobsite, Vacuuming – Ditch Witch FX25 User Manual

Page 31: Fx25 operator’s manual

Advertising
background image

Operation Overview - 30

FX25 Operator’s Manual

Planning

CMW

Planning

1.

Gather information about jobsite (page 34).

2.

Inspect jobsite (page 35).

3.

Check supplies and prepare equipment (page 37).

Setting Up at Jobsite

1.

Prepare jobsite (page 36).

2.

Position vacuum excavation unit (page 30).

3.

Leave unit hitched to towing vehicle or properly stabilized if trailer-mounted unit.

4.

Block trailer wheels if trailer-mounted unit.

Vacuuming

1.

Connect hoses (page 44).

2.

Start unit (page 47).

3.

Remove debris (page 48).

4.

Disconnect hoses.

5.

Drain tank (page 51) or unload to another tank (page 53).

Advertising