Start unit, Standard procedure, Fx25 operator’s manual – Ditch Witch FX25 User Manual

Page 48

Advertising
background image

FX25 Operator’s Manual

Vacuum and Pothole - 47

Start Unit

CMW

Start Unit

Standard Procedure

1.

Open tank inlet valve.

2.

If equipped with reverse flow, ensure vacuum is in “vacuum” mode before starting.

3.

Insert key.

4.

Turn key clockwise. See page 20 for more information.

EMERGENCY SHUTDOWN: Turn ignition switch to STOP.

IMPORTANT: If power pack is not connected to external tank
control valves, connect a -04 hose with a minimum working
pressure rating of 3000 psi (207 bar) from pressure (1) to power
beyond (2) connections on power pack.

NOTICE: Avoid idling engine with inlet valve closed.

1

2

1

2

j32om007h.eps

Advertising