Fx25 operator’s manual – Ditch Witch FX25 User Manual
Page 81
Advertising
Service - 80
FX25 Operator’s
Manual
50 Hour
CMW
Lube Blower Bearings
Wipe two zerks clean and lube every 50 hours
with HTG. Inject grease into zerk until clean
grease comes out of relief fittings.
Change Water Pump Oil
Change oil after the first 50 hours of operation
and every 100 hours thereafter. Change oil more
frequently if working in dusty conditions.
•
Drain at drain plug (3) while oil is warm.
•
Add NDO at fill (1) until oil is at halfway mark
on sight glass (2).
NOTICE: Do not inject grease too quickly.
Drive shaft seal damage could occur.
j32om045h.eps
j32om045h.eps
1
2
3
j32om046h.eps
j32om046h.eps
Advertising