Planning
CMW
Planning
1.
Gather information about jobsite. See page 31.
2.
3.
Classify jobsite. See page 34.
4.
Select best chain type and tooth pattern for your application. See page 62.
5.
Consider optional equipment, if necessary. See page 64.
6.
Check supplies and prepare equipment. See page 36.
7.
Load unit onto trailer. See page 43.
Trenching
1.
Unload unit from trailer. See page 46.
2.
Leave optional backfill blade, if equipped, in stowed position with digging boom low to ground.
3.
4.
Drive to starting point of trench. See page 39.
5.
6.
Leaving Jobsite
1.
Restore the jobsite. See page 70.
2.
Rinse unit and stow tools. See page 70.
3.