Prepare unit for towing, Return unit to normal operation – Ditch Witch RT Line User Manual

Page 48

Advertising
background image

RT12/RT16/RT20/RT24 Operator’s Manual

Transport - 47

Tow

Prepare Unit for Towing

1.

Ensure parking brake is engaged.

2.

Block wheels.

3.

Connect to tow point.

4.

Turn tow valves (shown) counterclockwise
two turns.

5.

Unblock wheels.

6.

Disengage parking brake.

Return Unit to Normal Operation

1.

Engage parking brake.

2.

Block wheels.

3.

Disconnect from tow point.

4.

Turn tow valves clockwise two turns.

5.

Unblock wheels.

6.

Disengage parking brake.

Advertising