ENMET SE-5175 User Manual

Page 7

Advertising
background image

SE-5175

ENMET Corporation

5


3.2 Wiring the SE-5175

The electrical installation should conform to appropriate electrical codes, such as the National Electrical Code in the United
States.

W

ARNING

:

The compliance of the installation to appropriate codes is not

ENMET

’s responsibility.

C

AUTION

:

Area must be declassified during installation.

Run conduit and 16

AWG

(1.5

MM

2

)

wires to the enclosure from the power supply and controller. Or use a 3 wire power cord of

0.20 to 0.35” in diameter.

After releasing the screws and lifting the cover and exposing the terminal strips on the bottom of the circuit board.

Connect the wires from the controller (power supply) to the supplied J4 plug then attach to J4 terminal.

3.2.1 Power Supply

Upon supplying power to the

SE-5175

:

The green power on LED is lit.

The display backlight is lit, and instrument will step through a start-up sequence: unit serial number and software revision
may be shown on the display.

The instrument may go into alarm briefly, but the sensors stabilize quickly. If the instrument persists in alarm, acknowledge the
alarm by pressing the

S

ELECT

button. If alarm persists longer than 30 minutes, call

ENMET

customer service personnel.

J4

P

LUG

T

ERMINAL TO

C

ONTROLLER

W

IRING

Position

Function

1 +

24

V

DC

power

2

GND

3

4 - 20 mA out

4*

RS-485 D+

5*

RS-485 D–

*Contact

ENMET

for Modbus Address information

J8

P

LUG

T

ERMINAL TO

S

ENSOR

W

IRING

Position Function

Sensor

1

V +

Red

2

Signal

White

3

GND

Black

Figure 4: Power Terminal Connections SE-5175

Plug J4

To J4

Wires to

Controller

5
4
3
2
1

J4

J8

1 2 3

Circuit Board Bottom View

Plug J8

To J8

Wires to

Sensor

2

3

1

Advertising