WaterFurnace Envision Hydronic (NSW) User Manual

Page 11

Advertising
background image

11

NSW INSTALLATION MANUAL

Hydronic Section cont.

Synergy3D

Thermostat

Open the screw 2 turns only in the end of the pump motor

(if Grundfos

®

pumps are used) to allow trapped air to be

discharged and to ensure the motor housing has been flooded.

Route thermistor wires to NSW. Remove yellow thermistor

wires on TB 3 and 4 from control box and connect thermistor

wires from geothermal storage tank. Set the pump sampling

(PS) in the set up of the control board to continuously (C)

sampling (reference Note 5 in the Wiring Schematic).

Adequate rate of flow (GPM) is very important to system

performance and long term reliability. Follow the guidelines

for recommended flow and pipe sizing in the NSW

recommendations table.

WaterFurnace Geothermal Storage Tank Thermostat

and Thermistor

Yellow Thermistor Wires Connected to TB (3 and 4) on

NSW Control Board

NSW

LOAD PUMP

HYDRONIC

LOAD

Source OUT

P/T Ports

P/T Ports

Ball Valve

Dielectric

Unions

Dielectric

Unions

WaterFurnace

NSW Series

NOTES:
*
A 30 psi pressure relief valve (Part No: SRV30) should be used in
hydronic applications.
** Vent valve or P/T port at highest point in return line prior to ball valve.

1-1/2 in.
FPT

Expansion

Tank

Air

Vent

Pressure

Gauge

30 psi

RELIEF VALVE

Air

Separator

FROM

HWG

TO

HWG

Back Flow Preventer /

Pressure Relief Valve

Source IN

GEO

STORAGE

TANK

PUMP

HOT

(Piped in

series to

an electric

water heater)

COLD

DOMESTIC

Dip Tube

Ball Valve

Vent Valve/

P/T Port**

Advertising