Wiring schematics - residential cont, Nsw installation manual, Legend – WaterFurnace Envision Hydronic (NSW) User Manual

Page 19

Advertising
background image

19

NSW INSTALLATION MANUAL

Wiring Schematics - Residential cont.

NSW Reversible with IntelliStart - 208-230/60/1

Transformer

NOTE 1

Red

208 V

Compressor

Unit

Power Supply

CC

T1

L1

T2

Brown

G

C

R

S

Blue

24V

Microprocessor Control

TEST

PIN

HP

HP

CC

CG

HI

LO

C

LP

LP

R

CC

CG

HI

LO

C

LP

LP

R

HP

LP

Black/

White

Blk/Wht

Violet

White/Blue
White/Blue

LPR

T

RT

Orange

X1

EL

T

E

LT

R

T

R

T

X

2

X

1

X1

E

LT

E

LT

R

T

R

T

X2

X1

Green/Yellow

P1

P2

P3

X

3

X

3

X

3

X

3

LPR

Interface Panel

Black
Black

Yellow

Violet
Violet

Orange
Orange

Gray
Gray

1
2

3
4
5
6
7
8

TB

1

1

G

Load

Pump

External

X2

X

2

PS1

RV RVG

SIR

R C Y1 O X1

G

External

SI

Cap

9

10

11

12

Not Used

Not Used
Not Used

Green/Yellow

Yellow

24 V

B

C

D

L2

L2

L1

L1

T1

T1

T2

T2

LFB

SFB

NOTE 2

Brown/Wht

Brown/Blk

Red

Black

Orange

Black/Gry

Black/Wht

L2

208-230/60/1

Source

Pump

MODE

RVR

RVR

T

RT

Yellow

RC

NOTE 3

RVR

T

ELT

Org/Wht

Org/Blk

Blue

Blue

Black

Black

Yellow
Yellow

Violet

Black/Org

Org/Gry

Org/Brn

HP

HP

Black
Black

Red

Org/Grn

Orange

NOTE 4

Note 5

CC

Black

Com

Blue/Wht

Blue

Blue

230V

Black

Tan

Black

Run Winding

Active

Start

Common

IntelliStart

Pink

Black

2

1

PB

Red

Red

Blue

Factory low voltage wiring

Legend

Switch - High pressure

Switch - Low pressure

Relay coil

Field wire lug

Ground

Relay Contacts -

N.O., N.C.

Polarized connector

Notes:

Factory line voltage wiring
Field low voltage wiring
Field line voltage wiring
Optional block
Quick connect terminal

Screw terminal - field connection

Compressor Contactor

High Pressure Switch

Low Pressure Switch

Load Pump Relay Contacts

L1

1

3

2

P

Capacitor

Reversing Valve Output

Entering Load Side Water Temperature

T

Thermistor

Refrigerant Liquid Line Temperature

Slave Input Relay

Reversing Valve Coil

Fuse

1. Taped and wire tied off

Load Pump Fuse Block

Source Pump Fuse Block

2. 3AG 10 Amp fuse

3. Move jumper wire to 5 and 6 for reversible
secondary

unit.

4. Black Thermistor - Source Coax Blue
Thermistor - Load Coax
5. For cycle load pump with a geo storage tank.
Remove the orange wire from the LPR relay coil
and install a jumper between the LPR relay coil
and the comp contactor coil as shown in the
schematic

above.

CC -

-

HP -

LP -

LPR -

RV

ELT -

RT -

SIR -

RC -

LFB -

SFB -

RVR - Reversing Valve Relay

04/02/09

Advertising