f)
When “STATUS” “Write block [xxx] OK” appears, the main board upgrading is finished.
b)
Please refer to the main board upgrade steps.
c)
Please remember to plug the 4-pin cable mentioned in “step a” back to“J20 IR
OUT” of the main board after upgrading all the 8 signal-in boards
11