Prime mover operating positions – Pengo DT-5 User Manual

Page 16

Advertising
background image

16

Two Speed (DT & RT) Series Manual

PRIME MOVER OPERATING POSITIONS

C) Recommended:

Transport Position

Cradle the Drive against the mounting frame during
transport on the job site.

These illustrations represent the recommended working, transport and resting positions for your Pengo Drive attachment
when used with a skid loader prime mover.

A) Recommended:

Starting Position

Position the Drive and Auger vertically in desired
location and begin drilling.

B) Recommended:

Drill

Lower the prime mover arms in a
consistent vertical manner.

D) Recommended:

Resting / Parked

Park the prime mover with the Auger on the
ground.

E) Avoid:

Drilling Position

Avoid any drilling position that is not vertical. Auger
will be unstable and not easily controlled.

F) Avoid:

Drilling Position

Avoid any drilling position that is not vertical. Auger
will be unstable and not easily controlled.

G) Avoid:

Transport Position

Avoid transporting the Auger in a suspended free
swinging position. Damage can occur.

H) Avoid:

Resting / Parked Position

Avoid parking the prime mover with Drive and
Auger in a suspended position.

See page 17 for proper
sequence.

Drive torque capacity limited to 12,000 ft/lbs Max when
used on skid loader.

Advertising
This manual is related to the following products: