SECTION D:
TEST RUN

PREPARATION


1. Make sure the exhaust pipe is installed properly.
2. Make sure the fuel tank is installed properly. Make sure there is no fuel leakage.
3. Make sure there is no water leaking from piping. (Plumbing)
4. Make sure electrical connections and grounding are wired properly.
5. Make sure the floor is stable and can withstand strong vibration and the weight of a full

water heater.

6. Make sure the area is free of flammable materials.
7. Check for air trapped in fuel lines.

OPERATION


1. Open the fuel tank valve.
2. Press the power switch on the control panel to turn on. “Operation” lamp goes on.
3. Open hot water faucet and unit will ignite in a few seconds.
4. Make sure that the unit works properly.