Beisler 100-54 User Manual

Page 38

Advertising
background image

2-16

07

Pick up duration [0,10 sec.]
time how long the folder presses on the piping

08

Clamp down automatically
if defined, the main clamp closes after reaching the insertion position
and the set time

09

Time after clamp down
time delay between clamp down and next operation

16

Time before insertion
after the set time the main clamp drives from the insertion position to
sewing start (foot pedal machine process pressed)

17

Piping blowing off
piping and flap are blown to the folder, to prevent a tilt movement of
the piping; time may not be too long, since otherwise the thread will be
blown to the needle

18

‘Thread clamp open’ at seam start (Beisler sewing head)
after the first two stitches the upper threads should be released from
the thread clamp; after the time defined here, the thread clamp opens

19

‘Thread clamp open’ - duration
duration of ‘thread clamp open’ at seam start

21

Cut til upper thread
time for catching and cutting of the upper thread

22

Upper thread cutting time
length of the threads after upper threads picked up

23

Scissor cutting time
influences the zipper scissor to cut the zipper completely before
moving to the end position

24

Drive to cutting
percentage of the clamp speed used by the main clamp to drive to the
mitre knifes

25

Mitre knife distance
distance between the mitre knifes

26

Mitre knifes cutting time
cutting time of the mitre knifes

27

Main clamp open
open the main clamp after mitre cutting; if time’s too short, the work
piece may slip out of the machine before taken by the stacker

28

Taking parts
when taking parts with weak clamp (inner pocket production) the main
clamp opens after mitre cutting, the final roller moves the part lateral
from the clamp; then the clamp is switched with this parameter, that
the main clamp detects the work piece faster and brings it to the
insertion position

29

Turn til final roller [0.1 sec.]
time for the start of the final roller

30

Time til final roller up [0.5 sec.]
keeping the work piece after rolling, until the stacker has taken the
work piece

31

Clamp speed [90%]
speed of the main clamp to the insertion position

32

Process step-by-step [00]
enter >01 to enable the switching of all machine functions

33

Remaining thread counter on/off [00] (option)
function can be enabled and disabled; 01 = remaining thread
monitoring on; this disables the spool thread counter

Advertising
This manual is related to the following products: