Water system setup procedure, Water regulator set up – Belshaw Adamatic Harmony Deck Oven User Manual

Page 14

Advertising
background image

WATER SYSTEM SETUP PROCEDURE

It is imperative that the water delivery to the deck oven is checked for the

steam system to operate correctly

1. Flush out the main feed pipe to be used, until water runs clear and free from debris.

2. Connect main feed to oven.

3. Connect flexible hoses to each deck.

4. Place a container under the test valve.

5. Slowly open test valve fully and with the water flowing check the regulator is set to

0.75 bar. If not adjust using the screw above the valve.

x Never use the oven above this setting


6. When the pressure has stabilised shut the test valve.

REPEAT 4,5 AND 6 AT THE END OF INSTALLATION.

NOTE. DYNAMIC PRESSURE, NOT STATIC, IS BEING MEASURED.

FG257 MODULAR DECK 02/07 RAC

13

STOP TAP

ADJUSTING SCREW

SET TO 0.75 bar

TEST VALVE

FILTER

TO OVENS

FROM SUPPLY
CHECK VALVE

RESTRICTOR

WATER REGULATOR SET UP

LOCATED ON REAR OF OVEN

REGULATOR

Advertising