Caple C2500SS User Manual

Page 5

Advertising
background image

5

GAS CONNECTION

The oven is designed to operate with both natural gas (methane) and liquid gas (LPG),
and can be easily converted from one type to another following the instructions given in
the relative section of this booklet. Connection to the gas supply must be carried out by
qualified technicians and in conformance with the requirements.
If the appliance is to operate with gas bottles (LPG), a pressure regulator conforming to
the requirements.

RIGID PIPE CONNECTION

Connection to the mains gas supply may be made via a rigid pipe firmly attached to the
fitting “G” (Fig. 3), or via a flexible stainless steel continuous-wall hose, conforming with
a maximum length of 2 metres.
The fitting “G” and seal “C” are supplied with the appliance, and comply with standards.

Important:
Use two wrenches to turn the fitting “G” to the required position. When the fitting is in the
desired position, firmly tighten nut “A” (Fig. 3).

Fig. 3

WARNING - IMPORTANT: after connecting the appliance to the gas supply (or
to the liquid gas bottles) CHECK FOR LEAKS at the union using a solution of
soapy water (never use a naked flame).

Advertising