Comtech EF Data PCB-4000 User Manual

Page 6

Advertising
background image

PCB-4000 1+1 Phase Combiner

Revision 2

Table of Contents

MN/PCB4000.IOM

iv

2.2 

Monitor and Control (M&C) Interface Connectors ................................................................ 2–3 

2.2.1  “SYSTEM COM | J1” Connector ................................................................................................ 2–3 
2.2.2  “SSPA COM 1 | J2” / “SSPA COM 2 | J3” Connectors ............................................................... 2–4 
2.2.3  “SSPA SW OUT | J5” Connector ................................................................................................ 2–5 
2.2.4  “RF INPUT SWITCH | J6” Connector ......................................................................................... 2–6 

2.3 

RF Interface Connectors ........................................................................................................ 2–6 

2.3.1  “RF IN 1 | J7”, “RF IN 2 | J8” Connectors .................................................................................. 2–6 
2.3.2  “SSPA OUT 1 | J9” Connector ................................................................................................... 2–6 
2.3.3  “SSPA OUT 2 | J10” Connector ................................................................................................. 2–7 

2.4 

Power and Ground Interfaces ............................................................................................... 2–7 

2.4.1  AC Power .................................................................................................................................. 2–7 
2.4.2  Ground Connector .................................................................................................................... 2–7 

CHAPTER 3.

  INSTALLATION, STARTUP, AND TROUBLESHOOTING PROCEDURES ........

......................................................................................................................... 3–1

 

3.1 

Overview .............................................................................................................................. 3–1 

3.2 

System Assembly, Cabling, and Installation .......................................................................... 3–2 

3.2.1  1+1 Phase Combiner System Assembly .................................................................................... 3–2 
3.2.2  PCCB Cabling Connections ........................................................................................................ 3–3 
3.2.3  System Component Installation and Interconnection .............................................................. 3–4 

3.3 

Initial System Setup and Verification .................................................................................... 3–5 

3.3.1  LED Status Operation ................................................................................................................ 3–6 

3.4 

Gain or Amplitude Balance Verification and Alignment ......................................................... 3–7 

3.5 

Amplitude Alignment (as necessary) ..................................................................................... 3–8 

3.6 

Phase Alignment ................................................................................................................... 3–9 

3.7 

System Online and Transmitting ......................................................................................... 3–10 

CHAPTER 4.

  UPDATING FIRMWARE ................................................................................. 4–1 

4.1 

Updating Firmware via the Internet ...................................................................................... 4–1 

4.2 

Getting Started: Preparing for the Firmware Download ........................................................ 4–2 

4.3 

Downloading and Extracting the Firmware Update ............................................................... 4–5 

4.4 

Performing the Automated FTP Upload Procedure ............................................................... 4–8 

 
 

Advertising