Daktronics S SERIES User Manual

Page 9

Advertising
background image

5

HOIST OPERATION

Hoist operation:

The MCC is the single point of operation for the Vortek S Series System.

There is one master RUN button located on the MCC along with an UP/OFF/DOWN selector switch

for each hoist in the system. There is an E-STOP button located at the bottom of the MCC as well.

To raise a hoist, turn the selector switch for the

desired hoist to the UP position (Figure 2) and

press RUN. The hoist will run at full speed in the

up direction. The hoist will run until the button is

released and/or the hoist reaches its upper hard-

struck limit switch. When the move is completed,

return the selector switch back to OFF.

To lower a hoist, turn the UP/OFF/DOWN selector

switch for the desired hoist to the down position

and press RUN. The hoist will run at full speed. The

hoist will run until the button is released or the hoist

reaches its lower hard-struck limit switch.

Up to 4 hoists can be run at one time using multiple selector switches. The hoists will run in the direction

selected, meaning that some could be running up and others down.

The position displays show the height above the floor for each batten (Figure 3). This is set during

initial installation and should not need to be changed.

However, with these displays, whenever the red button is pushed, it re-sets the display to a pre-set

number which is 4.00 ft even if the batten is above or

below 4.00 ft.

To set the display so that the batten height above floor is correct, lower (or raise)

the batten to 4 ft (have someone measure with a tape measure to the BOTTOM

of the batten) and then push the red button on the display.

Warning:

If any problems arise during any hoist motions, depress
any of the EMERGENCY STOP buttons.

FIGURE 2: Selector switches

FIGURE 3: Position display

Advertising