Digi-Star John Deere 1990 CCS Dual Rank 30/36/40/44 User Manual

Page 5

Advertising
background image

Scale Bracket and Load Cell Mounting Installation

D3866-US-Rev A

John Deere Planter Scale

3

Use Figures 2 and 3 for steps 9 - 13

9. Install the front top bracket by using the 5/8 x 3 1/2” special bolts. The cropped bolt edge is installed next to

the 4 x 4 tubing and from the top (see Figure 2). Install the front top bracket by using 5/8 x 2” bolt and two 5/8”

washers, flange nut (see Figure 3).
10. Assemble load cell to the front base plate by using 3/4 x 3 1/2 in. bolts and locknut. Do not tighten bolts

completely. You may have to slide load cell while aligning base and top brackets.

TOP DECAL NEEDS TO

BE ON TOP OF LOAD CELL!

(See Figure 2 or 3)

11. Install front base plate weldment to the main frame with the yoke plate on the bottom. Reuse the original

frame bolt (see Figure 2). Install front base plate weldment to the main frame with the supplied 5/8 x 8.75” U-

bolts and 5/8 top lock flange nuts (see Figure 3).

Figure 3

Front Leg Assembly

JD 1990 Dual 40’ & 44’

(Right Side Shown)

Figure 2

Front Leg Assembly

JD 1990 Dual 30’

(Left Side Shown)

NOTE:

To make the front

load cell support fit, the

existing planter support

pin may need to be

modified. With a hand

grinder, chamfer the

bottom pin edge.

IMPORTANT!

Do not

remove the existing

support pin. The front pin

is spring loaded.

Advertising
This manual is related to the following products: