Cab control 400 – Digi-Star Cab Control 400 User Manual

Page 8

Advertising
background image

Cab Control 400

6

Example below illustrates how to set up a system with two
scales. ! ! is set to , "

* *

is set to % minutes and

Scale #1 and Scale #2 are enabled:

! !

* *

%

(

(

(

+

(

%

( ,

+

(

'

(

(

&

( -

(

(

.

( /

(

NOTE: On systems with six or less scales, use scales

numbered 1 through 6.

To run the self-test on the Cab Control 400, follow

instructions under “Setup Cab Control 400” steps 1 through

7 on page 5 and press [Net/Grs] in step 8.

!

If the power supply voltage drops below the (10.5 Volts), the

message

0 "

1

"

0 "

1

"

0 "

1

"

0 "

1

"

#

2 1

$ $

#

2 1

$ $

#

2 1

$ $

#

2 1

$ $

and 3 4

3 4

3 4

3 4

will

periodically show on the display to alert the operator of the

low battery condition.

NOTE: If

"

is displayed, the indicator power (not the

Cab Control 400 power) is below 10.5 volts.

Warning!

Disconnect the Cab Control 400 power cord

before jump-starting or fast-charging the

battery.

Advertising