EM Acoustics X3-DFSP self-powered downfill element User Manual

Page 22

Advertising
background image

Page 22 of 36

X3-SP User Manual

v1.0 May 2012

Step 3 – Attach FC-X3 enclosure lift beam

FC-X3 beams are required for flying,
regardless of the configuration. How many
beams and where in the array they attach
depends on the number of X3 elements
present, and whether 1 or 2 pick-up points
are required. See the diagrams above for
illustrations of the different combinations
possible.

The image to the right shows the two holes
on each primary rigging point where the
links on the FC-X3 engage. Insert the FC-
X3 into the slots and secure the Fc-X3 with
the four ball-lock pins attached to the FC-
X3, through the holes marked as shown (Item 1).

Two X3 enclosures connected together
via the FC-X3 enclosure lift beam.

Advertising