Installation – Flowserve NRGS 16-1 User Manual

Page 11

Advertising
background image

11

Installation –

continued

Table 1

Function

e. g. First low-level alarm

e. g. Feed pump ON

e. g. High level alarm

e. g. Feed pump OFF

Function

Electrode rod

3

4

2

1

Length [mm]

Attention

The seating surfaces of the threads or flange provided on the vessel or
boiler standpipe must be accurately machined. Fig. 5

Do not bend electrode rod when mounting.

Do not lag electrode body.

Note

For the approval of the boiler standpipe with connecting flange the
relevant local and national regulations must be considered.

See four examples of installation on page 17.

Tools

Open-end spanner 41 mm A. F.

Bolt cutter

Hacksaw

Flat file, medium cut