Installation – Flowserve NRGS 16-1 User Manual
Page 11
Advertising
11
Installation –
continued
Table 1
Function
e. g. First low-level alarm
e. g. Feed pump ON
e. g. High level alarm
e. g. Feed pump OFF
Function
Electrode rod
3
4
2
1
Length [mm]
Attention
■
The seating surfaces of the threads or flange provided on the vessel or
boiler standpipe must be accurately machined. Fig. 5
■
Do not bend electrode rod when mounting.
■
Do not lag electrode body.
Note
■
For the approval of the boiler standpipe with connecting flange the
relevant local and national regulations must be considered.
■
See four examples of installation on page 17.
Tools
■
Open-end spanner 41 mm A. F.
■
Bolt cutter
■
Hacksaw
■
Flat file, medium cut