1. Switch on mains supply and check the correct functioning of the equipment at the

corresponding switchpoints. LEDs , , and are provided for visual check
of switchpoints. Fig. 7

Remove housing cover to check LEDs , , and . See “Wiring”

Commissioning

Warning

1. Check whether the system NRGS 16 -1, NRGS 16 -1 S has been wired according

to wiring diagram Fig. 8.

2. Check whether mains supply corresponds to the wiring carried out on the

equipment.

The terminal strip of the NRGS 16 -1/ NRGS 16 -1 S is live during operation.
This presents the danger of electric shock.
Cut off power supply before removing or replacing housing cover.

Wiring check

Application of mains voltage

G

G

G

G

G

H

H

H

H

H

IIIII

K

K

K

K

K

J

J

J

J

J

1. Check whether the designated switchpoints – i. e. switch functions – have been

correlated with the individual electrode rods. See table 1.

Check correlation of switching functions

H

H

H

H

H

IIIII

J

J

J

J

J

K

K

K

K

K