Greenheck, Sure-aire v 1.00 – Greenheck High Voltage (100-240 VAC) Sure-Aire Pressure Controller (475742) User Manual

Page 6

Advertising
background image

6

Sure-Aire™ Flow Monitoring System

2-10 Vdc Output Signal Transmitter
Calibration Procedure

4 to 20 mA/
2-10 Vdc (+)

4 to 20 mA/
2-10 Vdc (-)

Shield

Temperature

Sensor

1

2

3

TB2

4

5

100 to 240 Vac

50/60 Hz

Input Power

Earth Ground

Line

Neutral

3/8 A 250 Vac

MEDIUM LAG

1

2

3

TB1

Sure-Aire Controller

LCD Touch Display

1.0 Test Equipment

1

.1 Digital multimeter. Set multimeter to read DC

voltage.

1.2 Make sure Output Signal type is set to 2-10 Vdc.

2.0 Interconnect Wiring

Greenheck

Sure-Aire V 1.00

Output Signal:

2-10v

Exit

Prev

Next

Edit

2

.1 Validate the power is off on the DC power supply

and the Sure-Aire controller.

2.2 Validate the multimeter is set to read DC voltage.

2.3 Interconnect the multimeter (+) probe to TB2 pin 1.

2.4 Interconnect the multimeter (-) probe to TB2 pin 2.

2

.5 Apply power to the Sure-Aire controller.

2.6 Press the Setup button on the Touch Panel

Interface.

2.7 Keep pressing the Next button until you reach the

Transmitter Min Value screen.

2.8 Press Edit, then Inc or Dec until the digital

multimeter reads exactly 2.00 Vdc

2.12 Press Edit, then Inc or Dec until the digital

multimeter reads exactly 10.00 Vdc.

2.13 Press Enter to store the new value.
2.14 Press Exit to return to the main screen
2.15 2-10 Vdc transmitter calibration completed.

2.9 Press Enter to store the new value.

2.10 Press Next.

2.11 Transmitter Max Value.

Greenheck

Sure-Aire V 1.00

Transmitter Min Value:

1827

Exit

Inc

Dec

Enter

Greenheck

Sure-Aire V 1.00

Transmitter Max Value:

720

Exit

Inc

Dec

Enter

NOTE

Apply a vacuum to the High Port and the 2-10 Vdc
transmitter will track the span of the pressure range.
i.e. The Sure-Aire controller with a pressure sensor
of 0 - 41.51 in. W.C. installed, 2.00 Vdc = 0 in. W.C.,
10.00 Vdc = 41.52 in. W.C.

®

Advertising