Dukane 8755E-RJ User Manual

Page 103

Advertising
background image

7

Settings

Schedule Setting (Continued)

Item

Description

Specific date No1

Configures the specific date (No.1) schedule.

Schedule

Click the [Enable]

check box to enable specific date (No.1)

scheduling.

Month/Day

Configures the Month and date.

Schedule List

Displays the current specific date (No.1) schedule.

Specific date No.2

Configures the specific date (No.2) schedule.

Click the [Apply] button to save the settings.

Schedule

Click the [Enable]

check box to enable specific date (No.2)

scheduling.

Month/Day

Configures the Month and date.

Schedule List

Displays the current specific date (No.2) schedule.

Specific date No.3

Configures the specific date (No.3) schedule.

Schedule

Click the [Enable]

check box to enable specific date (No.3)

scheduling.

Month/Day

Configures the Month and date.

Schedule List

Displays the current specific date (No.3) schedule.

Specific date No.4

Configures the specific date (No.4) schedule.

Schedule

Click the [Enable]

check box to enable specific date (No.4)

scheduling.

Month/Day

Configures the Month and date.

Schedule List

Displays the current specific date (No.4) schedule.

Specific date No.5

Configures the specific date (No.5) schedule.

Schedule

Click the [Enable]

check box to enable specific date (No.5)

scheduling.

Month/Day

Set the Month and date.

Schedule List

Displays the current specific date (No.5) schedule.

Advertising