MEGA Corp. MAC-INSP-RSP-5 User Manual

Page 10

Advertising
background image

2-1

MAC/MAT-INSP-RSP-5

4 Feb 2014

SECTION 2

Scheduled Maintenance Inspections

Contents

DESCRIPTION

This section establishes scheduled maintenance inspections of the installed MAC/MAT at the designated
frequencies. Performing these inspections will identify potential system discrepancies and allow preventative
maintenance to be performed before a component or system is rendered totally inoperative.

**NOTE: Vehicles operated in extremely low quality water environments may require more frequent inspec-
tions.

FREQUENCY

STEP

SPRAY HEADS

WEEKLY    

(150 HRS)

BI‐WEEKLY 

(250 HRS)

MONTHLY 

(500 HRS)

QUARTERLY 

(1000 HRS)

SEMI‐

ANNUAL 

(2500 HRS)

ANNUALLY 
(5000 HRS)

1

Check spray head for damage and clean 
deflector ring and spray head opening. 

X

2

Check hydraulic lines for security, 
damage and leaks.

X

3

Check spray head drop‐in assembly for 
leaks with spray head switch OFF and 
water pump ON. Replace drop‐in 
assembly as required.

X

4

Check spray head base plate and upper 
housing mount bolts for security.

X

5

Check spray head adjustable deflector 
ring for damage and correct adjustment. 
Apply dry‐film lubricant to the deflector 
inner ring.

X

6

Check spray head base plate for 
evidence of leaks. Replace base plate O‐
ring as required.

X

Description .........................................................................2-1
Spray heads........................................................................2-1
Control System..................................................................2-2

MAC Structure...................................................................2-2
M-3 Water Pump System...............................................2-3
M-4, M-4B Water Pump System ..................................2-4

Advertising
This manual is related to the following products: