M-3 water pump system, M-3 water pump system -3, Scheduled maintenance inspections – MEGA Corp. MAC-INSP-RSP-5 User Manual

Page 12

Advertising
background image

MAC/MAT-INSP-RSP-5

4 Feb 2014

SECTION 2

Scheduled Maintenance Inspections

2-3

STEP

M-3 WATER PUMP SYSTEM

150 HRS

(WEEKLY)

250 HRS

(BI‐WEEKLY)

500 HRS

(MONTHLY)

1,000 HRS

(QUARTERLY)

5,000 HRS

(ANNUALLY)

1

Remove water pump from unit and check: water 
pump impeller retaining bolt/nut for security and 
for damage or contact to the impeller, impeller 
keyways for wear and security, shaft bearings for 
signs of heating and wear, drive end shaft keyways 
for signs of damage and heating and seals for 
security, damage and over or under lubrication. 
Check volute case for damage or contact. Check 
both of the impeller wear rings for damage and 
excessive wear. Check packing mount for security. 
(Disassembly of water pump is required to perform 
these maintenance operations). Repair as required.

X

2

Check shaft seals for excessive lubricant leakage 
and water leakage. Lubricate water pump with a 
manual grease gun only. When lubricating the drive 
motor side shaft bearing and the impeller end 
bearing, apply 16 to 20 squirts (injections) of grease 
(2 fl. oz. or 60 cc) to each. Adjust, repair or replace 
as required.

X

3

Check water pump and drive motor for leaks, 
excessive vibration/noise leaks and evidence of 
excessive heating. Repair as required.

X

4

Check rope seals for excessive water leakage, 
compression, wear and overheating. Adjust rope 
packing seal packing gland or replace rope packing 
seals as required.

X

5

Check water pump inlet and discharge piping for 
security, leakage and misalignment. Repair leaks as 
required.

X

Advertising
This manual is related to the following products: