Installation – Montigo MD38 DV2 User Manual

Page 5

Advertising
background image

Page 5

MD38-DV-2 Homefire

Part No. XG0111

Installing Terminations with Built-In Frames

Installing Terminations with MSR Frames

12

12

1. Frame the termination opening to 12" x 12".

2. Fasten the termination to the studs using a minimum of 4 screws.

11

11

1.

Frame the termination opening to 11" x 11".

2.

Fasten the termination to the studs using a minimum of 4
screws.

Installing Terminations with MOSR Frames

12

12

12

MOSR

1.

Frame the termination opening to 12" x 12".

2.

Fasten the MOSR frame to the interior side of the studs using a
minimum of 4 screws.

3.

Insert the termination into the MOSR frame as shown here, and
attach by screwing through the four pilot holes in the termination.

MSR

MTO-3

MTO-3F

MTO-3

MTKOG

1.

Ensure that the two

long mounting brackets are facing the

bottom of the termination. (See inset). This will provide more
heat protection at the top of the termination, where temperatures
are highest.

2.

Attach to the faceplate of the termination using four sheet metal
screws.

Installing Heat Guards over Terminations

Installation

Advertising
This manual is related to the following products: