Installation check list – Paloma PH-28R IFSN User Manual

Page 25

Advertising
background image

A. Outdoor Water Heater Location

q

Outdoor water heaters must be installed outdoors.

q

Protected from freezing temperatures.

B. Indoor Water Heater Location

q

Close to area of vent termination.

q

Indoors and protected from freezing temperatures.

C. Outdoor and Indoor Water Heater Location

q

Proper clearance from combustible surfaces observed.

q

Sufficient fresh air supply for proper operation of
water heater.

q

Air supply free of corrosive elements and
flammable vapors.

q

Provisions made to protect area from water damage.

q

Sufficient room to service heater.

q

Combustible materials, such as clothing, cleaning
materials, rags, etc. clear of the heater and
vent piping.

q

Water heater is properly attached to the wall.

D. Water Supply

q

Water supply has sufficient pressure.

q

Air purged from water heater and piping.

q

Water connections tight and free of leaks.

q

Water filter is clean and in place.

q

Materials used are as instructed in this manual.

q

Water pipes are insulated and protected from
freezing.

E. Gas Supply

q

Gas type matches rating plate.

q

Gas supply pressure is sufficient for the water heater.

q

Gas line equipped with shut-off valve, union and
sediment trap.

q

Approved pipe joint compound used.

q

Soap and water solution used to check all connections
and fittings for possible gas leak.

q

Gas Company inspected installation (if required).

F. Relief Valve

q

Pressure Relief Valve properly installed and discharge
line run to open drain.

q

Discharge line protected from freezing.

G. Venting (Indoor Water Heaters Only)

q

Vent pipe material should be category III and meet
UL1738 in US and ULC S636 in Canada.

q

Vent connector(s) pitched (1/4” per foot of length
minimum) DOWNWARD or UPWARD to
termination. If UPWARD, a condensate trap must be
installed close to the heater. See page 14.

q

Vent connector(s) securely fastened together with
high temperature silicone (500°F [260°C]) and
air-tight.

q

All vent runs are properly supported.

q

Vent terminal is properly installed.

q

Sufficient combustion air is available.

q

Maximum and minimum vent lengths are observed.

H. Electrical Wiring

q

Voltage matches rating plate.

q

Water heater is properly grounded.

q

Supply cord and/or wiring meets all local codes.

Installation Check List

25

Advertising
This manual is related to the following products: