Initial setup – Smithco Spray Star 2005/2005D Operator Manual User Manual
Page 19
Advertising
17
Operation
PARTS MANUALS AVAILABLE ONLINE AT smithco.com
INITIAL SETUP
6. Touch the “AccuBoom” Blue Box
7.
Touch to Check “Use Spray Zone Map”
8. Touch the Yellow New “Field Boundary Map” 9.
This will bring up the Keyboard Screen
Again, Name the New Field Boundary Map;
it’s best to use the same name as the New
Job file. Touch the Green “Check” Circle
This will return you to the Job “As Applied” Screen
10. Creating a Field Boundary
Drive to the area where you want to start your Spray Zone. Press the Green “Menu” Box in the Lower
Right Corner
To Bring Up the Tools Menu Along the Right Side
Press the Black “Boundary Tools” Box
Touch the Black “Record Field Boundary” Box
Advertising
This manual is related to the following products: