Initial setup – Smithco Spray Star 2005/2005D Operator Manual User Manual

Page 19

Advertising
background image

17

Operation

PARTS MANUALS AVAILABLE ONLINE AT smithco.com

INITIAL SETUP

6. Touch the “AccuBoom” Blue Box

7.

Touch to Check “Use Spray Zone Map”

8. Touch the Yellow New “Field Boundary Map” 9.

This will bring up the Keyboard Screen
Again, Name the New Field Boundary Map;
it’s best to use the same name as the New
Job file. Touch the Green “Check” Circle

This will return you to the Job “As Applied” Screen

10. Creating a Field Boundary

Drive to the area where you want to start your Spray Zone. Press the Green “Menu” Box in the Lower

Right Corner

To Bring Up the Tools Menu Along the Right Side

Press the Black “Boundary Tools” Box

Touch the Black “Record Field Boundary” Box

Advertising
This manual is related to the following products: