5. CONSIDERATIONS FOR LIFT PLACEMENT

Vertical Clearance:

Once the location of the Lift is determined, please verify that there is sufficient space above the
ceiling to accommodate the Lift, screen, and any accessories that you might be installing.

Ensure that nothing will interfere with the Lift operation.

The Lift needs a minimum clearance of 14-inches [35.6cm] of vertical height in the ceiling [the
Lift support structure and accessories not included. With this arrangement there will be 7-inches
[17.8cm] of clearance for the screen and screen mount. The PCC-2 Ceiling Closure adds 3-inches
[7.6cm] and the PPS-1 Plenum Shroud adds 2-inches [5cm] to the height of the application. See
Figure 2 below.

Figure 2. SVS Plasma One 4 Side View

(shown with screen and PCC-2 Ceiling Closure)

Horizontal Clearance: Because the screen is stored horizontally, it may be necessary for the installer to
cut and re-support the main or load bearing beams. If so, please make sure that the ceiling will be
appropriately modified to meet installation requirements and that the modifications will maintain the
structural integrity of the ceiling. Always follow local and national codes in the modification of any
structure. Please keep in mind that the ceiling opening will vary with the size of the screen. See Figure 3
for horizontal layout and Figure 9 to calculate the horizontal space required for the screen and lift.

Figure 3 SVS Plasma One 4 Top View

SVS Plasma One 4 Lift Installation Instructions