Plasma lift, Ceiling closure & installation – SVS PLASMA ONE 7 User Manual

Page 8

Advertising
background image

Figure 6.

5. Ceiling Closure & Installation:

a. Preliminary notes:

The SVS PCC1 Ceiling Closure Framework kit is supplied as an optional accessory and is attached directly
to the ceiling with a hinge. The hinge must be attached to a solid support structure since there is a forward
pull force on the Ceiling Closure when the lift closes, which causes a strain on the hinge support. The
ceiling closure accessory is shipped in a separate cardboard box.

The ceiling framework is shipped partially assembled and must be completely assembled before installing.

The PCC1 kit includes:

- One (1) Main Support

- One (1) Hinge

- Two (2) Cross Frameworks

- Four (4) Angle Brackets

- Two (2) End Frameworks

- One (1) Hinge Spacer

- Assorted hardware kit

- One (1) spare Hardware kit

b. Assembling Closure Framework:

Step 1: The (2) Cross and (2) End Frameworks are supplied with extra length that will be "cut to fit". Two
of the end pieces have been pre-cut at 45 degrees on one end and have angle brackets attached--all four
sides should be completed the same way with angle brackets installed inside the tubing. To determine the
size of the framework, leave approximately 1” of clearance on all sides between the the ceiling hole opening
and the assembled Framework.
Then, cut the rest of the tubing at a 45 degree angle and drill as shown on the Figure 7. Connect the four
pieces using the angle brackets provided, with either 1/8" pop rivets or screws.

SVS PLASMA LIFT INSTALLATION

PAGE 8 OF 16

MOUNTING HOLE LOCATIONS

29.5"

.05"

24.0"

23.0"

SIDE MOUNTING
HOLES
3/8: DIA. HOLE
(4) PLACES

4.6875"

0.8125"

12.38"

14.0"

23.0"

TOP MOUNTING
HOLES
3/8" DIA. HOLE
(4) PLACES

PLASMA LIFT