Westermo ODW-720-F1 User Manual

Page 16

Advertising
background image

16

6651-2221

… Using the factory DIP-switch settings:

… Set DIP-switch S2:1 as desired.

… Connect The fibre link between the ODW-720-F1.

… Connect the power supply to both ODW-720-F1.

… After a few seconds the fibre link should be in operation, indicated by an active CH1

LED.

… Connect the serial cables from PLC master and slave to respective ODW-720-F1.

… Frames from PLC master that are correctly received the ODW-720-F1 should be

indicated by flashing TD LED.

… Frames that are received via the fibre link will be transmitted to the PLC slave

and indicated by flashing RD LED.

… Replies from slave to master will be transferred and indicated in the opposite way.

… The point-to-point application is up and running.

POWER

CH 1

COM +VA +VB COM

POWER

CH 1

COM +VA +VB COM

TX

RX

TX

RX

Start up guide, point-to-point application
Follow the steps below to get the unit up and running in a simple application.

Master

Slave

Advertising
This manual is related to the following products: