Fig. 1 fig. 2 fig. 3 – Equator BCR 500 User Manual

Page 10

Advertising
background image

10


Installing the CO

2

Cylinder Support

· Install the metal support provided onto the 4 studs located on the exterior back wall. Align the

holes in the support with the studs and push down firmly. (See Figure 1)


Installing the CO

2

Cylinder

· Install your fully charged cylinder into the support stand.


Installing the CO

2

Regulator

· Attach the CO

2

regulator to the cylinder by turning the regulator nut onto cylinder valve, making

sure washer is securely inserted into connecting nut. Tighten snug using an adjustable wrench
(not supplied) and assure there are no leaks. (See Figure 2)



Installing the CO

2

Air Line Outside Cabinet

· Remove plug located at the exterior back (top left hand corner).
· Save it for later use if you decide to convert unit to an all refrigerator.

· Insert the open end of the air line (red) line the cabinet through the uncovered hole.

(See Figure 4)

Installing the CO

2

Air Line Hose To Regulator

· Attach the open end of the red hose to the hose barb connection on the regulator

· Secure hose by using one clamp provided. Use pliers/screwdriver to tighten clamp to prevent

leaks. (See Figure 3)



Installing the Beer Tower
· Remove the top plug by twisting and pulling out, saving it for later use if you decide to convert unit

to an all refrigerator unit.

· Unravel the beer line (clear hose) from the tower and insert the beer line and wing nut through the

uncovered hole on top.

· Lock the beer tower assembly to the top and make sure to position the beer faucet so it is aligned

with the cabinet front (6 o’clock position). You accomplish this by aligning the bottom of the beer
tower to the 3 grooves on the top cabinet and tighten by hand clockwise to properly lock.


Installing the Protective Metal Plate
· This plate should always be installed when the keg is in place to protect against unnecessary

damage to the floor of the cabinet.


Fig. 1

Fig. 2

Fig. 3

Advertising